ENGINEERED FOR PROTECTION. BUILT WITH PRECISION.

Every Stark Group vehicle begins with a clear specification and in-house engineering. From our facility in Barrie, Ontario, we plan each build around your protection requirements and vehicle configuration.

Our inspection team checks the vehicle throughout production and at final handover. Defined quality standards guide each stage, keeping protection, precision and your approved specification at the centre of the process.

STAGE 01

CONSULTATION AND SPECIFICATION

We review your protection level, vehicle model, configuration and delivery date. Together, we agree the exact specification before the build moves forward.

STAGE 02

VEHICLE SOURCING AND DELIVERY

We source the chassis or vehicle, or receive the vehicle you already own. Transport is arranged to bring it to our facility.

STAGE 03

ARRIVAL AND INCOMING INSPECTION

Your vehicle is unloaded and documented with photos. Before any work starts, it is checked against the approved specification.

STAGE 04

ENGINEERING AND PRODUCTION PLANNING

Our engineering team confirms the final drawings. Materials are allocated and the build is scheduled.

STAGE 05

ARMORING AND FABRICATION

Ballistic steel, glass and reinforced components are fitted station by station. Each stage is inspected and signed off as the build progresses.

STAGE 06

FINAL ASSEMBLY AND FINISH

The vehicle is reassembled and fitted with your selected options. It is then checked against your order.

STAGE 07

FINAL QUALITY CONTROL

A full inspection, functional checks and a road test complete the final quality control stage. Customer acceptance takes place at our factory when required.

STAGE 08

SHIPMENT AND HANDOVER

Following release approval, the vehicle is photographed before loading. Secure transport and delivery confirmation complete the handover.

6–12 WEEK TYPICAL LEAD TIME · B4 TO B7 PROTECTION LEVELS · 100% CANADIAN-MADE · LIFETIME WARRANTY